3.5 Implement the Stormwater Master Plan
Action Item Description
Upgrades to Manhattan’s stormwater and drainage systems are a high priority given that many residential and commercial areas are located where street and property flooding occurs. The City has identified numerous capital improvement projects throughout community watersheds to increase performance of the systems and to reduce flood risk. Capital improvements to stormwater infrastructure should continue to be pursued along with educational programming for property owners and the general public.
Initiatives
% Complete |
Results from |
Stormwater Capital Improvement Program (CIP)
0% | Q4-24 |
What we're watching
Start Date: 01/01/2023 |
End Date: 12/31/2026 |
Status Update |
|
Status Indicators:
Completed|
In Progress |
Ongoing |
Future Action |
On Hold |
In Design |
Under Construction
![Completed Status Icon](/wp-content/uploads/2023/12/Completed-Green.png)
![In Progress Status Icon](/wp-content/uploads/2023/12/In-Progress-blue.png)
![Ongoing Status Icon](/wp-content/uploads/2023/12/Orange-Ongoing.png)
![Future Action Status Icon](/wp-content/uploads/2023/12/Future-Action-purple.png)
![On Hold Status Icon](/wp-content/uploads/2023/12/On-Hold-Yellow.png)
![In Design Status Icon](/wp-content/uploads/2023/12/In-Design-Purple.png)
![Under Construction Status Icon](/wp-content/uploads/2023/12/Under-Construction.png)
Measures
Actual |
Results from |
MEASURES TBD
Status Indicators:
On Target|
Caution |
Below Target |
No Target
![On Target Icon](/wp-content/uploads/2023/12/On-Target.png)
![Caution Status Icon](/wp-content/uploads/2023/12/Caution.png)
![Below Plan Status Icon](/wp-content/uploads/2023/12/Below-Plan.png)
![No Target Status Icon](/wp-content/uploads/2023/12/No-Target.png)